Home Services Products Projects References Profile  
Products
 
 
 
 
 
 
 
 
 
 


News

Morocco
A contract for Site Acquisition has been awarded to Linfra... more
Guinea Conakry
Linfra has opened its branch locally and... more
ISO certification
To achieve world-class customer satisfaction... more
 
Environment

fast-built sites


spider

Introduction

The Spider solution is ideal for the fast deployment of GSM network. The Spider does not need any civil work (excavation, concrete base,..) it only needs a slightly leveled soil where the spider will be erected and thus in some countries permits are not needed for the site. Normally, the erection of the spider solution needs around 24 hours to go live on Air. The solution exists in 30m, 35m and 40 meters tower size.

 
 


Description

“Spider family” is a heavy duty structure equipped with metallic tower up to 40 meter on the roof of the shelter. All products of the family are suitable for rural and/or sub-urban sites. “Spider family” is covered with International deposit certification issued by the World Intellectual Property Organization (WIPO) concerning the Industrial design of the product.

 
 


Product Standard

The “spider product” is designed to operate under the worst climatic
and ground conditions, as they are specified in Eurocode 1
(ENV 1991 - 1 to 2-4) and the Hellenic Seismic Action Regulation
2000 respectively (worst case of Europe region).


Civil works requirements

Slightly leveled soil is required
Concrete basement is optional and not needed
No need for concrete blocks for tower anchoring.

Ancillary elements included:

• Power distribution box with main   functions (main breaker, Switch for   Rectifier, Switches for Air   Conditioning, ancillary fuses for   light and supply sockets).
• Internal lights 2 rooftop elements
• Internal electrical plant of light wires,   and sockets
• Entrance plate for feeders 4x4
• Internal metallic tray for feeders &   wires
• Internal copper tape 30x3 for earth   ring
• 2 copper bar with isolators
• Door sensor
• High Temperature sensor
• Obstruction lights & control panel
• Earthing kit
• Lightening bar at the top of the   tower.




Home | Services | Products | Projects | References | Profile | Site Map | Contact Us | Careers