Lebanon
• Huawei
Implementation of GSM network for OGERO (50.000 subscribers). BTS, BSC and Core network installation.
• ALFA Swap
Dismanlting and swaping Ericsson BTS to NSN BTS
• Alcatel
Installation and alignement of Micro Wave links.
|
Syria
• Operators: Areeba Syria, Syriatel Syria
IE, DT, implementation and integration were done for several MSC, BSC and R-BSC (Ericsson Equipment);
• STE Syria
- Implementation Management for Switching-Transmission and Fiber Optic projects.
- IE, Data Configuration, installation, testing and commissioning of Fiber Optic Links for Transmission Project (STM-1, STM-4), 25% expansion of Current Ericsson Network (over 120 sites) and for 10% expansion of Current Ericsson Network (over 30 sites).
- Installation, testing and commissioning of Switching Project, 250 Kline, 25% expansion of Current Ericsson Network (over 80 sites).
- Supervision of the 1100 km FO cable backbone project.
|
Jordan
• Ericsson
- Implementation Management was done for the MSC, BSC, SOG and AXD-330;
- IE/DT was prepared for two SCP and HLR.
|
|
 |
|
 |
|
|