Home Services Products Projects References Profile  
Products
 
 
 
 
 
 
 
 
 
 


News

Morocco
A contract for Site Acquisition has been awarded to Linfra... more
Guinea Conakry
Linfra has opened its branch locally and... more
ISO certification
To achieve world-class customer satisfaction... more
 
Environment

fast-built sites


mobsite
 

Introduction

The “Mobsite solution” is ideal for the fast deployment of telecom networks. The solution needs 24 hours to go live on Air whenever the concrete base is ready


Description

“Mobsite solution” is a heavy-duty structure equipped with a metallic lattice tower up to 40 meters on the roof of the shelter. It is suitable for rural and/or sub-urban sites. The “Mobsite family” is covered with International deposit certification issued by the World Intellectual Property Organization (WIPO) concerning the Industrial design of the product

Product Standard

The “Mobsite product” is designed to operate under the worst climatic and ground conditions, as they are specified in Eurocode 1 (ENV 1991 - 1 to 2-4) and the Hellenic Seismic Action Regulation 2000 respectively (worst case of Europe region).


Civil works requirements

Slightly leveled soil is required
Concrete basement is optional and not needed
No need for concrete blocks for tower anchoring.


 

Ancillary elements included:

• Entrance plate for feeders 4x4
• Internal metallic tray for feeders   and wires
• Power distribution box + 2 lights +   wiring, sockets
• Copper plate internal ring + 2   copper bar + external earthing   plugs
• Obstruction lights & control panel
• Incorporated Fuel tank up to 900 Lt
• Incorporated extending guides for   AC outdoor units
• Diesel generator room & extension   railways for maintenance


Home | Services | Products | Projects | References | Profile | Site Map | Contact Us | Careers